Modular Storm Tanks - SW Water

Project Location:
South West England - Devon
Client Name:
South West Water
Challenge
• Full integration into the existing live sites required.
• Ops handover and training.
• 12 weeks to meet WINEP dates from start to finish.
• Design freeze 4 weeks from WINEP date.
• Utilise temporary technology to provide a permanent solution for the client and the EA.
Solution
Integrated delivery model setup between client, contractor and supply chain to enable agile decision making to accelerate processes.
Thinking outside the box to produce fit for purpose cost effective design solutions deliverable within the very tight timeframes.
Adopting SWW provided items for the works and modifying their designs with a “just in time” approach to enable procurement to still meet WINEP dates.
Resources and skills pulled in nationally from right across the OCU group of companies to get the works delivered for SWW.
24/7 working utilised to help achieve.
Project Description:
OCU took on the emergency job of the installation of several modular storm tanks at 3 different live site locations to meet key WINEP dates for SWW compliance to the EA for 2024 in a 12-week window as PC and PD for SWW at their request in Devon.
Key Stats:
3 different site locations
7 modular storage tanks installed in total
Option E emergency works
Full turnkey D&B with OCU as PC/ PD on all sites
12 weeks
Duration

Outcome
Industry leading innovation in achieving the WINEP dates with the solutions utilised.
Three fit for purpose storm tank solutions delivered in very tight timeframes.
Low carbon footprint works utilising maximum offsite manufacture possible to minimise site works.
Overcame internal SWW challenges by supporting the capital delivery team in getting solutions approved by their internal stakeholders (operations) as a collaborative team.