Pitkevy 40 MW BESS Project

Project Location:
Pitkevy
Client Name:
TagEnergy
Challenge
Design and build for a new technology with detailed design development progressed alongside the construction works.
Design review and approval process with several key parties – BESS manufacturer, Route to market provider, O&M contractor and DNO.
Stakeholders and Service providers were consulted for the crossing of large diameter watermains, two high-pressure gas pipelines and alteration of fibre networks.
Several landowners, residents and businesses along the contestable 33kV grid route required close liaison and co-operation.
Challenging ground conditions on site required floated roads, ground improvement layers and areas of rock break-out.
Solution
Our Balance of Plant (BoP) Electrical and Civils solution included:
Earthworks 4,000m³
Imported 6F Capping 10,000t
Imported Type 1 3,000t
28 separate foundations (150m³)
Two basement Structures
DNO substation building (40m³)
33kV Contestable grid route 2km
HV/LV cabling 7,000m
Two powered storage containers
27 Tesla megapack 2 XL battery systems
14 MV Transformers
Project Description:
Our teams delivered the Civil and Electrical works associated with a new 50MW Battery Energy Storage System (BESS).
Key Stats:
Development of 50MW Battery Energy Storage Facility
Principal Contactor
Power engineering & design
Civils design
Temporary works
Balance of plant infrastructure installation
Commissioning and handover
46 weeks
Duration